# Final exported card text and speaker notes Extracted from the current Gamma PowerPoint export. Live Gamma remains the presentation master. ## Card 1 FOR BUILDERS Building with XBeton AAC blocks and reinforced panels: a practical introduction for builders AAC architecture reference: third-party photo, not an XBeton project ### Speaker notes Lead with execution. This deck helps a builder decide what to evaluate and what information the project team needs before pricing or scheduling AAC. Sources: https://www.xbeton.com/; https://app.notion.com/p/402649e354be81dd827bfeb2d71a75b5 Lead with execution. Start with scope, not speed claims. The photograph is a supplier construction reference, not evidence of a newly completed XBeton contract. Full attribution: Architectural inspiration: AAC architecture reference, a third-party project photo, not an XBeton project. Not a newly completed XBeton contract. Image source (AAC architecture reference, third-party project): https://www.xbeton.com/web/image/1853-1319a560/LAS%20VEGAS%20METRO%20PD%20%282%29.jpg ## Card 2 The planning questions that shape the job Resolve scope and ownership before comparing installation effort or pricing. Product and assembly Site execution Installed quote Which product and assembly fit the application? What changes for the crew and equipment plan? What belongs in the installed quote? Design team Builder and installer XBeton and estimator Architectural inspiration: build hero house. Not an XBeton project. ### Speaker notes The product choice affects coordination. Start with the scope, not a blanket speed claim. A useful review includes the responsible designer, builder, installer and supplier. Sources: XBeton-FAQ-Guide.pdf (2025 edition) pp. 17-24; https://build.xbeton.com/builders Begin with these scope questions. Confirm who owns each decision rather than treating a product selection as a complete construction plan. Displayed image: hero-house.jpg (build.xbeton.com/media), an architectural inspiration image of a modern house, not an XBeton project photo. The earlier AAC reference URL (Las Vegas project) was a removed image and is not the current image source. ## Card 3 The XBeton product system Illustration: generic AAC blocks, not a product photo. AAC BLOCKS Blocks and special masonry shapes REINFORCED PANELS Reinforced wall, floor and roof panels BOND & SHIELD Bond & Shield does not replace detailing. Illustration: generic coating layer, not a product photo. ### Speaker notes Mirror the main website taxonomy. The 2026 product list also identifies mortars and accessories. Select product-compatible materials for the job. Bond & Shield is part of the current product story, not a universal substitute for detailing. Sources: https://www.xbeton.com/; XBeton-FAQ-Guide.pdf (2025 edition) pp. 5-6, 13-16; 2026 XBeton List.pdf pp. 1-4, product names only Discuss the products as parts of an assembly. Confirm compatibility and project-specific detailing rather than assuming one system material resolves every junction. Graphics: the AAC block, reinforced panel and Bond & Shield coating layer shown on this card are native generic illustrations drawn from shapes, not product photos or factory renders. The card background is a navy gradient with no photo. No logos or product packaging are shown. ## Card 4 Blocks and panels change different tasks Task Blocks Reinforced panels Layout Masonry layouts and local fitting. Application-specific panel layout. Handling Plan unit handling and staging. Plan lifting, access and equipment. Openings and services Coordinate openings and MEP early. Coordinate openings and MEP before fabrication. Design documents Confirm assembly details. Shop drawings coordinated with the engineer of record. Illustration: generic reinforced panel, not a product photo. REINFORCED PANELS Do not assume every panel can be field cut. Coordinate connections as well as openings and services. ### Speaker notes Do not imply that every panel can be field cut. The FAQ identifies certain Power Panel products as non-cuttable and requires shop drawing coordination with the engineer of record. Confirm each product's instructions before modifications. Sources: XBeton-FAQ-Guide.pdf (2025 edition) pp. 17-20 Panels are not all field cuttable. Require application-specific shop drawings coordinated with the engineer of record, including openings, connections and MEP. Verify permitted modifications before work begins. Graphics on this card are native, generated illustrations of a block and a reinforced panel, not product photographs or factory renders. The panel caption on the slide labels it as a generic illustration. ## Card 5 INSTALLATION PLANNING Installation planning Planning overview, not an installation instruction. Illustrative navy layout. No product photograph. 01 A prepared base and first course 02 Approved mortar, reinforcement and connections 03 Coordinated service routes and compatible finishes 04 Inspection and quality checks ### Speaker notes This is an orientation, not a field method statement. The FAQ describes thin-bed mortar and standard cutting tools for relevant masonry products. Manufacturer guidance and project drawings govern actual work. Sources: XBeton-FAQ-Guide.pdf (2025 edition) pp. 17-22 This sequence is orientation, not a method statement. The approved project documents, manufacturer instructions and responsible design professionals govern execution. Confirm requirements before mobilizing the crew. No photograph is displayed on this card. The visuals are native navy shapes and an illustrative layout, not product or factory images. The earlier AAC block URL was a removed image and is not a current image source. ## Card 6 Efficiency needs a project baseline 30-40% Supplier reports 30-40% less labor time. Handling and sequencing can change the result. Two claim-range endpoints only. Source: xbeton.com website claim. Actual labor depends on scope, crew, logistics and assembly. Illustrative index from supplier claim, not project results Compare crew hours for the same wall scope. ### Speaker notes The website states a 30-40% labor-time reduction. Indexing the baseline at 100 gives a claimed AAC range of 60 to 70. This is arithmetic explaining the supplier claim, not a measured case study or quote. A pilot should track actual person-hours and installed wall area. Sources: https://www.xbeton.com/ (Fast Build Time section) The 30-40% claim indexes to 60-70 against a baseline of 100. This is arithmetic, not a case study or measured project result. The two AAC bars are endpoints of one claim range, not separate projects. Compare equal wall scope and record actual crew hours. Image source (AAC architecture reference, third-party project): https://www.xbeton.com/web/image/1853-1319a560/LAS%20VEGAS%20METRO%20PD%20%282%29.jpg ## Card 7 The installed-cost scope Unpriced by intent. Confirm the whole scope before comparing quotes. Scope item What to confirm Responsible party Material quantities, freight and unloading Takeoff, shipment scope and unloading provision. XBeton and builder Labor, equipment and crew learning Crew assumptions, lifting needs and familiarization. Builder and installer Connections, MEP coordination and finishes Included details, interfaces and compatible materials. Design team and trades Waste, exclusions and schedule assumptions Allowances, omitted work and sequencing basis. Estimator and builder Architectural inspiration: build hero house. Not an XBeton project. ### Speaker notes The 2026 list is marked confidential and its extracted price fields are blank. Use it only to understand product formats and packaging. A current project quote needs consistent units and a stated scope. Avoid a universal cost-per-square-foot promise. Sources: XBeton-FAQ-Guide.pdf (2025 edition) pp. 23-24; 2026 XBeton List.pdf notes The 2026 list is confidential and unpriced. Do not introduce prices or imply a complete installed quote. The responsibilities shown are proposed coordination roles and should be confirmed for the project. Displayed image: hero-house.jpg (build.xbeton.com/media), an architectural inspiration image of a modern house, not an XBeton project photo. The earlier AAC reference URL (Las Vegas project) was a removed image and is not the current image source. ## Card 8 BUILDER CHECKLIST Fire performance starts with the tested assembly 01 Request the test report Ask XBeton for the applicable fire-test and assembly report. 02 Match the build-up Match wall or roof build-up, thickness, joints, openings, support and finishes to the tested product. 03 Confirm for this project Have the design professional and local authority confirm suitability for this project. Supplier marketing references a 6-hour rating [NEEDS VERIFY]. The assembly test report has not been reviewed. ### Speaker notes Fire ratings apply to tested assemblies, not to a material on its own. Confirm the exact wall or roof build-up, thickness, joints, openings, support and finishes against the applicable test report. The 6-hour figure is a supplier marketing reference and is marked NEEDS VERIFY. The assembly test report has not been reviewed, and evidence is pending. Do not treat either figure as an approved rating for a proposed assembly. No photograph or logo is displayed on this card. Sources: XBeton-FAQ-Guide.pdf (2025 edition); https://www.xbeton.com/ ## Card 9 BUILDER CHECKLIST What to bring to a project review A clear scope lets the team discuss the right product, details and installed quote. 01 Plans and application Site plan, wall, floor and roof use, and approximate area. 02 Location and schedule ZIP code, delivery access and target dates. 03 Design and performance needs Structural role, openings, fire, acoustic and thermal targets, and missing reports. 04 Installation and quote scope Crew, equipment, finishes, freight and exclusions. Bring these inputs to the XBeton project conversation on the next card. ### Speaker notes Use this as a suggested discussion checklist for the builder before the project conversation. It is not a claim that XBeton operates a formal pilot program, and no project data has been measured yet. Walk through the four inputs: plans and application, location and schedule, design and performance needs, and installation and quote scope. Ask the builder to gather what they can now; missing items can be listed as open questions. Sources: https://build.xbeton.com/builders; XBeton-FAQ-Guide.pdf (2025 edition) p. 27 ## Card 10 Request a project review Choose the destination that matches your next planning task. Products https://www.xbeton.com/ Project planning https://build.xbeton.com/ Request a review www.xbeton.com/contactus Ask the builder to bring a real application and project location. Use https://build.xbeton.com/builders#project to begin. Architectural inspiration: AAC architecture reference, third-party photo. Not an XBeton project. ### Speaker notes Direct the builder to the appropriate planning or contact destination. Request project-specific confirmation; do not promise delivery dates or installer coverage. Ask the builder to bring a real application and project location. The contact page supports quote, information and engineering requests. Do not claim a fixed delivery date or geographic installer coverage without confirmation. Sources: https://www.xbeton.com/contactus; https://build.xbeton.com/builders Image source (AAC architecture reference, third-party project): https://www.xbeton.com/web/image/1853-1319a560/LAS%20VEGAS%20METRO%20PD%20%282%29.jpg