# Final exported card text and speaker notes Extracted from the current Gamma PowerPoint export. Live Gamma remains the presentation master. ## Card 1 1 FOR ARCHITECTS & SPECIFIERS Design with intent. Specify with clarity. Product, assembly and detail Architectural visualization ### Speaker notes Begin with design intent, then make the evidence path explicit. This is an evaluation briefing, not a specification, shop drawing or engineering approval. Sources: https://build.xbeton.com/specifiers Start with the architectural application. Build the specification around project evidence. Architectural inspiration. Project suitability requires review. ## Card 2 01 · APPLICATION The specification starts with the application Identify structural or nonstructural use. Define wall, floor, roof or cladding application, then coordinate fire, thermal, acoustic and moisture requirements. Application Requirement to establish Evidence needed Wall Structural or nonstructural role, exposure Product data and assembly reports Floor or roof Spans, loads, support conditions Manufacturer design data, engineer review Cladding Finish, movement, moisture behavior Finish system documentation Fire, thermal, acoustic Project-specific targets Applicable test reports and calculations Architectural inspiration. Scope the application before selecting a product. 2 ### Speaker notes Project requirements establish what the material must demonstrate. Scope the application before choosing a product or reusing a generic performance headline. Sources: https://build.xbeton.com/specifiers; XBeton-FAQ-Guide.pdf (2025 edition) pp. 5, 19-26 ## Card 3 Product families and design responsibility Select the product with the responsible design professionals. XBeton product image AAC blocks Masonry blocks and special shapes XBeton product image Reinforced panels Reinforced panel products Illustrative Bond & Shield application Bond & Shield Admixture and coating family Design responsibility: the engineer of record and design professionals confirm the product for each application. 3 ### Speaker notes Use the current website product taxonomy. For panels, confirm the manufacturer's design and shop drawing requirements with the engineer of record. Admixture/coating compatibility and test scope need their own documentation. Image sources: AAC blocks https://www.xbeton.com/web/image/2217-3e6e89f7/AAC%20Block%202.png ; reinforced panels https://www.xbeton.com/web/image/2214-c6cbe956/Panel%20pics.png ; Bond & Shield packages https://www.xbeton.com/web/image/2241-b1c7abe1/Xbeton%20Bags.png . Bond & Shield image: generated application illustration (not an XBeton product photo). Sources: https://www.xbeton.com/; XBeton-FAQ-Guide.pdf (2025 edition) pp. 13-20 ## Card 4 Material properties as an evaluation starting point Supplier-reported values depend on product and density. Request the exact product data before design. Property FAQ range Required project document Dry density 25-40 lb/ft³ Product data sheet for the selected class Compressive strength 290 to more than 1,090 psi Test report with class, conditioning and current revision Supplier-reported ranges, FAQ 2025 p. 6. Not design values. Product-dependent. Architectural inspiration: Nicholas C. Metropolis Center background photo. 4 ### Speaker notes These ranges come directly from the FAQ. They are not a declaration of performance for one selected product. The same FAQ has a block table with different density bands, so do not treat this broad range as universal. Confirm class, conditioning, test basis and current revision. Sources: XBeton-FAQ-Guide.pdf (2025 edition) p. 6 ## Card 5 Fire performance and the evidence gap 6-hour fire rating [NEEDS VERIFY] Owner-selected marketing claim. Assembly/test evidence pending. Request the applicable assembly report and limitations. Confirm product, thickness, joints, openings and support conditions. 5 ### Speaker notes The owner selected six hours as the marketing default. The website and marketing playbooks state six hours, while FAQ p. 7 states up to four hours and references UL designs. We have not independently reviewed those listings or a six-hour test report. Keep the warning visible. Never represent a referenced standard as product certification. Sources: https://www.xbeton.com/; XBeton-FAQ-Guide.pdf (2025 edition) p. 7 ## Card 6 Thermal and acoustic performance need assembly context Confirm declared thermal conductivity and thickness. Keep steady-state thermal resistance separate from thermal-mass effects. Review the tested acoustic assembly, finishes and junctions. Topic Document to request Thermal Declared conductivity, thickness, assembly calculation Acoustic Tested assembly report, finishes, flanking paths Junctions Current details from XBeton and project professionals Architectural visualization. Schematic relationships only. 6 ### Speaker notes The FAQ mixes nominal and effective thermal values, so this briefing does not turn those into a design table. Request documented properties and an appropriate assembly calculation. For sound, obtain the relevant test report and consider flanking paths. Sources: XBeton-FAQ-Guide.pdf (2025 edition) pp. 8-10, 18; https://build.xbeton.com/specifiers ## Card 7 Illustrative panel connection schematic. Not a project detail. Connections, openings and moisture detailing Support Structural load path and panel support Openings Door and window openings Penetrations MEP penetrations and attachments Moisture Vapor-compatible finish system 7 ### Speaker notes The FAQ has typical reinforcement and attachment illustrations, but they do not replace project drawings. Field cutting and drilling are product-specific. Coordinate finishes for vapor behavior and movement. Obtain current details from XBeton and responsible project professionals. Sources: XBeton-FAQ-Guide.pdf (2025 edition) pp. 17-23 ## Card 8 A clear submittal and compliance path Compile current product identification and data, applicable test reports and evaluation documents, plus project drawings, specifications and shop drawings. Document Revision Applicability Product data Confirm Confirm Assembly reports Confirm Confirm Shop drawings Confirm Confirm Environmental documentation Confirm Confirm Review by the design team and authority having jurisdiction. Applicability to be confirmed for each project. Architectural inspiration: background photo, Nicholas C. Metropolis Center. 8 ### Speaker notes The FAQ references TMS 402/602, ACI panel guidance, ASTM documents and UL designs. This is a list of references to verify, not proof that a specific current product or project complies. Do not include blanket 'approved in all states' claims. Sources: XBeton-FAQ-Guide.pdf (2025 edition) pp. 25-26; https://build.xbeton.com/specifiers Image: AAC construction reference (XBeton Industrial Facility 3), https://www.xbeton.com/web/image/2158-066d7179/Industrial%20Facility%203.png ## Card 9 Sustainability documentation for the selected product Request product-specific environmental information. Evaluate operational and embodied impacts separately. Confirm durability, finish and end-of-life assumptions. AAC architecture reference. Image only; no environmental certification implied. 9 ### Speaker notes The FAQ discusses sustainability and LEED contribution. Product selection can support project goals, but no point award or certification follows automatically. Obtain environmental declarations and test the lifecycle assumptions for the selected product and project. Sources: XBeton-FAQ-Guide.pdf (2025 edition) pp. 26-27 Image: AAC architecture reference, https://www.xbeton.com/web/image/1855-aef025b8/di020316014%201.jpg. The picture implies no environmental certification. ## Card 10 Request a technical review Share application, design stage and location. Identify performance requirements and missing documents. Bring the exact assembly questions. Product information https://www.xbeton.com/ Project resources https://build.xbeton.com/ Technical enquiry https://www.xbeton.com/contactus Specifier technical-review route: https://build.xbeton.com/specifiers#project Architectural visualization. 10 ### Speaker notes Use the specifier technical-review route or select Engineering on the main contact form. Submit project context and the questions still open. A review request starts a conversation, not an engineering approval. Sources: https://build.xbeton.com/specifiers; https://www.xbeton.com/contactus