# Exact Gamma refinement prompt Refine the existing 10-card XBeton deck without adding cards or changing its audience, approved claims or source assets. Use the template's actual Cabin heading/body fonts and Special Gothic Condensed One only for display accents. Set all heading text to navy #073274 and keep red #df131f accents and light gray #d8d8d8. Make the background quiet and flat. Fix overflow by trimming repetition before shrinking type. Reduce unnecessary eyebrow/kicker labels where they compete with the main title. Keep the authentic stacked logo unchanged and increase its header display to a clearly legible 60-72 px high at a 1280px-wide slide, preserving its aspect ratio. Keep slide numbers consistent at bottom right. Straighten and balance the contact slide. Keep all three real QR images side by side on white with quiet zones, minimum 220 px square at 1280px width, and short labels plus destination URLs. Preserve the actual QR images and all website photographs. Never replace the QR codes or logo with generated artwork. Keep '6-hour fire rating [NEEDS VERIFY]' exact and legible on the fire slide, with the status adjacent to the number. Simplify duplicated fire wording without removing the warning or supplier/assembly limitation. Add the supplied speaking guidance to real native speaker notes on each corresponding card. Do not put it in slide body text. Verify that notes are actually populated if your editing tools support that. Card 1 (Building with XBeton): Lead with execution. This deck helps a builder decide what to evaluate and what information the project team needs before pricing or scheduling AAC. Sources: https://www.xbeton.com/; https://app.notion.com/p/402649e354be81dd827bfeb2d71a75b5 Card 2 (The planning questions that shape the job): The product choice affects coordination. Start with the scope, not a blanket speed claim. A useful review includes the responsible designer, builder, installer and supplier. Sources: XBeton-FAQ-Guide.pdf (2025 edition) pp. 17-24; https://build.xbeton.com/builders Card 3 (The XBeton product system): Mirror the main website taxonomy. The 2026 product list also identifies mortars and accessories. Select product-compatible materials for the job. Bond & Shield is part of the current product story, not a universal substitute for detailing. Sources: https://www.xbeton.com/; XBeton-FAQ-Guide.pdf (2025 edition) pp. 5-6, 13-16; 2026 XBeton List.pdf pp. 1-4, product names only Card 4 (Blocks and panels change different tasks): Do not imply that every panel can be field cut. The FAQ identifies certain Power Panel products as non-cuttable and requires shop drawing coordination with the engineer of record. Confirm each product's instructions before modifications. Sources: XBeton-FAQ-Guide.pdf (2025 edition) pp. 17-20 Card 5 (Installation planning): This is an orientation, not a field method statement. The FAQ describes thin-bed mortar and standard cutting tools for relevant masonry products. Manufacturer guidance and project drawings govern actual work. Sources: XBeton-FAQ-Guide.pdf (2025 edition) pp. 17-22 Card 6 (Efficiency needs a project baseline): The website states a 30-40% labor-time reduction. Indexing the baseline at 100 gives a claimed AAC range of 60 to 70. This is arithmetic explaining the supplier claim, not a measured case study or quote. A pilot should track actual person-hours and installed wall area. Sources: https://www.xbeton.com/ (Fast Build Time section) Card 7 (The installed-cost scope): The 2026 list is marked confidential and its extracted price fields are blank. Use it only to understand product formats and packaging. A current project quote needs consistent units and a stated scope. Avoid a universal cost-per-square-foot promise. Sources: XBeton-FAQ-Guide.pdf (2025 edition) pp. 23-24; 2026 XBeton List.pdf notes Card 8 (Performance belongs to the complete system): The requested six-hour default is a marketing claim pending assembly/test evidence. The FAQ uses a four-hour description. Do not equate a material's resistance to a compliant whole-building assembly. Project-specific documents govern. Sources: XBeton-FAQ-Guide.pdf (2025 edition) pp. 7-10, 19-26; https://www.xbeton.com/ Card 9 (A focused first-project review): Recommend a defined review or pilot with the team before scaling. The measurement plan is our recommendation, not an existing XBeton program or a claim of published outcomes. Sources: https://build.xbeton.com/builders; XBeton-FAQ-Guide.pdf (2025 edition) p. 27; Measurement plan: recommendation Card 10 (Request a project review): Ask the builder to bring a real application and project location. The contact page supports quote, information and engineering requests. Do not claim a fixed delivery date or geographic installer coverage without confirmation. Sources: https://www.xbeton.com/contactus; https://build.xbeton.com/builders Refinement basis: supplied Gamma prompt playbook prompts 04 (paired QR codes), 06 (balanced contact slide), 14 (actual template fonts), 17 (quieter background), 25 (overflow), 27 (readable supporting text). Do not describe these editing instructions on the slides.